Street lighting project construction scheme

Street lighting project construction scheme

发布时间:2023-04-23 16:23:50 来源:本站 点击数:0

Street light lighting project is to improve the beauty of the city night scene and road safety, the original street light transformation or addition of the project. In general, the construction scheme of the street lighting project designed by Wenzhou lighting engineering enterprises mainly includes the following aspects:

First, construction preparation

1, according to the design drawings and site investigation, determine the scope, quantity, location, model, specifications of the street lighting project.

2, according to the construction schedule, organize construction personnel, materials, equipment, tools and other resources, and do a good job of construction safety and civilized construction measures.

3. Make technical disclosure with Party A, supervisor, design and other relevant units to solve possible problems in construction.

Second, line laying

1, according to the design requirements and site conditions, choose the appropriate line laying methods, such as overhead laying, buried laying, pipeline laying, etc.

2, according to the requirements of the code, the line protection treatment, such as adding steel pipe, plastic pipe, insulation sleeve, etc.

3, according to the requirements of the specification, the line is tested, such as insulation resistance test, grounding resistance test.

    温州路灯亮化工程

Third, lamp installation

1, according to the design requirements and site conditions, choose the appropriate lighting installation, such as vertical pole installation, boom installation, wall hanging installation.

2, in accordance with the requirements of the specification, the assembly of the lamps, debugging, test lighting and other work to ensure the integrity and functionality of the lamps.

3, according to the requirements of the specification, the lamp identification, numbering, record and other work, easy to manage and maintain.

Four, control system installation

1, according to the design requirements and site conditions, choose the appropriate control system installation mode, such as centralized control, decentralized control, intelligent control, etc.

2, in accordance with the requirements of the specification, the control system installation, commissioning, trial operation and other work to ensure the reliability and effectiveness of the control system.

3, according to the requirements of the specification, the control system for identification, numbering, record and other work, easy to manage and maintain.

5. Project acceptance

1, according to the contract agreement and standard requirements, the street lighting project to carry out partial acceptance and completion acceptance.

2. Record, summarize and archive the acceptance results and deliver them to Party A.

3. Clean up and restore the construction site to complete the construction tasks.